Marldon Cross Hill, Marldon, Paignton

Offers Over £325,000

Bungalow

Overview

2 Bedroom Bungalow for sale in Marldon Cross Hill, Marldon, Paignton

A two bedroom detached bungalow, situated in a highly sought after area, in the very popular village of Marldon. The property has been well maintained with extended kitchen/breakfast room, lounge with log burning stove and two spacious bedrooms with luxury shower room. Outside are private sunny gardens with long driveway to garage. The accommodation comprises:-

Key Features:

  • A TWO BEDROOM DETCAHED BUNGALOW
  • FAVOURED VILLAGE LOCATION
  • GOOD SIZED PLOT
  • PLENTY OF PARKING
  • WELL MAINTAINED
  • COUNTRYSIDE VIEWS

PROPERTY DESCRIPTION A two bedroom detached bungalow, situated in a highly sought after area, in the very popular village of Marldon. The property has been well maintained with extended kitchen/breakfast room, lounge with log burning stove and two spacious bedrooms with luxury shower room. Outside are private sunny gardens with long driveway to garage. The accommodation comprises:-


uPVC front door to:-


uPVC double glazed entrance porch. Door to:-


HALLWAY


LOUNGE/DINER Stunning multi fuel stove. Central heating radiator. uPVC double glazing.


KITCHEN/BREAKFAST ROOM Range of replaced modern light grey coloured units comprising 1.5 bowl sink unit with cupboards below. Range of wall and base units incorporating gas hob, eye level double oven and extractor hood. Larder cupboard. Central heating radiator. uPVC double glazing. Countryside views. uPVC double glazed door to rear.


BEDROOM ONE uPVC double glazing. Central heating radiator. Built in wardrobes and countryside views.


BEDROOM TWO uPVC double glazing. Central heating radiator. Built in wardrobes.


SHOWER ROOM Luxury double shower cubicle with mains shower, vanity basin and close coupled WC. Extractor fan, uPVC double glazing and built in cupboards. Central heating radiator.


OUTSIDE 


REAR GARDEN Nicely enclosed sunny gardens. Patio area with feature pond and lawned gardens with shrub borders.


SIDE GARDEN Vegetable garden area


GARDEN SHED 


GREEN HOUSE


AGENTS NOTES These details are meant as a guide only. Any mention of planning permission, loft rooms, extensions etc, does not imply they have all the necessary consents, building control etc. Photographs, measurements, floorplans are also for guidance only and are not necessarily to scale or indicative of size or items included in the sale. Commentary regarding length of lease, maintenance charges etc is based on information supplied to us and may have changed. We recommend you make your own enquiries via your legal representative over any matters that concern you prior to agreeing to purchase.

Read more

Important Information

  • This is a Freehold property.
  • This Council Tax band for this property is: D

epc

Flood Street, Stoke Gabriel, Totnes

2 Bedroom Cottage

Flood Street, Stoke Gabriel, Totnes

Shorton Valley Road, Paignton

3 Bedroom Bungalow

Shorton Valley Road, Paignton

Kings Ash Road, Paignton

3 Bedroom Semi-Detached House

Kings Ash Road, Paignton

Broadlands Road, Paignton

3 Bedroom Semi-Detached House

Broadlands Road, Paignton

Freshwater Drive, Paignton

2 Bedroom Bungalow

Freshwater Drive, Paignton

Broadpark Road, Paignton

4 Bedroom Detached House

Broadpark Road, Paignton


Update Cookies Preferences